Highlights
- CBK’s two advanced stage flagship assets, Copper Creek in Arizona (with a 2013 historic PEA) and Contact Copper in Nevada (with a 2013 PFS), have a combined BT-NPV of US$590M, at US$3.25/lb copper. CBK’s EV is just 7% of the BT-NPV. Over $120M has been spent on its projects to date.
-
- To read more about Copperbank Resources Corp. click below on downloads
Visit Faraday Copper Corp. page for more research, discussion boards and to like, and share.
Download Analyst Report
:
- Please log in or subscribe for free to download and read this report.