Grid Battery Metals Inc.
Advancing Lithium Projects Near Established Players in Nevada
Published: 5/8/2024
Author: FRC Analysts
*See important disclosures at the bottom of this reportSector: Basic Materials | Industry: Industrial Materials
Ticker Symbols:
CELL.V - TSX 🔹
Highlights
- Grid is advancing a portfolio of four Electric Vehicle (EV) metal projects in Nevada, and B.C. Nevada is one of the most attractive mining jurisdictions in the world, hosting Albemarle’s (NYSE: ALB) Silver Peak mine, the only lithium producing mine in North America.
- The mineralization of CELL’s lithium projects (Texas Spring, Clayton Valley, and Volt Canyon) is similar to that of advanced stage projects in Nevada, such as Lithium America’s (NYSE: LAC/MCAP: $1.4B) Thacker Pass project, and projects held by Ioneer (ASX: INR/ MCAP: $449M), American Lithium (TSXV: LI/MCAP: $196M), and Surge Battery Metals (TSXV: NILI/ MCAP: $63M). Based on the projects’ similarities and proximity, we see opportunities for M&A/consolidation in the region.
- CELL's management was responsible for the discovery of Surge's North Nevada Lithium Project (NNLP). Following their departure from Surge, the team established CELL by acquiring the nearby Tex